Wireless Ad-hoc Network Delay Analysis and Visualization

This code simulates delay in a wireless ad-hoc network with the interplay between Physical and Data link layers.
378 Downloads
Updated 1 May 2023

View License

The code simulates a wireless ad-hoc network, considering the effects of transmission delay, queueing delay, and propagation delay on packet transmission between nodes. The code sets parameters for the simulation, creates random node positions within an area, and calculates distance, adjacency, and delay matrices. It then simulates packet transmission between nodes, computes delays, and visualizes the network and delays between nodes on a graph.

Cite As

Ardavan Rahimian (2026). Wireless Ad-hoc Network Delay Analysis and Visualization (https://www.mathworks.com/matlabcentral/fileexchange/128854-wireless-ad-hoc-network-delay-analysis-and-visualization), MATLAB Central File Exchange. Retrieved .

MATLAB Release Compatibility
Created with R2023a
Compatible with any release
Platform Compatibility
Windows macOS Linux
Tags Add Tags
Version Published Release Notes
1.0